Luas Bridge Construction at Taney Road Dundrum.

date: 020809 63
A cable tensing device at the south end of the bridge. This is tensing the cables that run horizontally through the bridge to pull the sections together.
The process for inserting the horizontal support cables.
one - the cables are fed through from their very large spools
two - the cables are cut to length
three - the cables are pulled tight by machine

Taney Bridge - this image is one of many showing the construction of Taney Bridge, the Luas Suspension Bridge across Taney Junction/Crossroads in Dundrum, Dublin, Ireland. This is the Stephen's Green to Sandyford Luas Line (Line B). The photos are dated year-month-day, so July 29th 2002 is 020729.